What’s NEW on the installation?

In 2014 the feed center and pump rack has been replaced. Operator friendly, cleaner and fast colorchange, 3,5 minutes, up to 40 per day.

Manual touch-up needed?

Due to the wide range of products, touch up is preferred to minimize programming. HD technology increased capacity

What was the biggest challenge?

Minimum powder waste and highest output. Powder recovery on long and short batches, fast, safe and operator friendly color change is key.


  30.04.2016   admin